[Feb 26] Recalbox beta v3.1- Rock64 |[Feb 26] Recalbox 190222- RockPro64 / Minimal Debian by mrfixit2001 - 190222 - RockPro64 |[Feb 26] Q4OS 2.7-r2 - Pinebook 1080P / Pinebook |[Feb 22] Batocera Linux 5.20-20190121- RockPro64 | [Feb 19] Manjaro KDE 19.02 / Manjaro LXQT 19.02 - Pinebook1080P / Pinebook | [Feb 19] Slackware Aarch64 Miniroot and XFCE 20190201 - RockPro | [Feb 19] Slackware Aarch64 Miniroot and XFCE 20190201 - Rock64

Project Inspiration | Get Started | IRC Logs | Forum Rules/Policy


Preorder ROCKPRO64 Early June 2018 Shipment
#1
Who's ready to order a ROCKPRO64 for the next June shipment?
  • I've added an event to my calendar to check the news section for early June.
I don't have any control over ordering a ROCKPRO64, but I'm curious on everyone's interest level.
Reply
#2
I would like at least 2, possibly 4. Im also adding a calendar item to remind me to check.
Reply
#3
I want one..
Reply
#4
The first batch production ROCKPro64 board starts ship out on tomorrow. This is some people will get their board as early as late next week.

The second batch of production will starts on Monday after collecting all production data from first batch. The most time consuming is the ROCKPro64 8 layer PCB fabrication and we will negotiate with PCB factory for fasttrak. We will try our best to release the second batch on early June, however realistic schedule is mid June.
Reply
#5
2 to start
Reply
#6
(05-10-2018, 03:57 PM)tllim Wrote: The first batch production ROCKPro64 board starts ship out on tomorrow. This is some people will get their board as early as late next week.

The second batch of production will starts on Monday after collecting all production data from first batch. The most time consuming is the ROCKPro64 8 layer PCB fabrication and we will negotiate with PCB factory for fasttrak. We will  try our best to release the second batch on early June, however realistic schedule is mid June.

Thanks for the detailed update.

Are you able to reveal how many RockPro64's will be produced in the mid-June batch?
Reply
#7
(05-12-2018, 10:37 AM)Rustproof Wrote:
(05-10-2018, 03:57 PM)tllim Wrote: The first batch production ROCKPro64 board starts ship out on tomorrow. This is some people will get their board as early as late next week.

The second batch of production will starts on Monday after collecting all production data from first batch. The most time consuming is the ROCKPro64 8 layer PCB fabrication and we will negotiate with PCB factory for fasttrak. We will  try our best to release the second batch on early June, however realistic schedule is mid June.

Thanks for the detailed update.

Are you able to reveal how many RockPro64's will be produced in the mid-June batch?

Sorry that in general we don't reveal production quantity.

PINE64 operates in organic growth path and don't accept investment, this allows us to participate with PINE64 community and not need to get influence by investor decision. Since not need to chase on money trace for investor and low operating cost, this allows PINE64 operate in slim profit margin and pass this benefit to community.

BY saying so, this means that we produces enough quantity base on limited cash flow we have in hand, but not large enough to flood the whole market.
Reply
#8
(05-12-2018, 03:07 PM)tllim Wrote:
(05-12-2018, 10:37 AM)Rustproof Wrote:
(05-10-2018, 03:57 PM)tllim Wrote: The first batch production ROCKPro64 board starts ship out on tomorrow. This is some people will get their board as early as late next week.

The second batch of production will starts on Monday after collecting all production data from first batch. The most time consuming is the ROCKPro64 8 layer PCB fabrication and we will negotiate with PCB factory for fasttrak. We will  try our best to release the second batch on early June, however realistic schedule is mid June.

Thanks for the detailed update.

Are you able to reveal how many RockPro64's will be produced in the mid-June batch?

Sorry that in general we don't reveal production quantity.

PINE64 operates in organic growth path and don't accept investment, this allows us to participate with PINE64 community and not need to get influence by investor decision. Since not need to chase on money trace for investor and low operating cost, this allows PINE64 operate in slim profit margin and pass this benefit to community.

BY saying so, this means that we produces enough quantity base on limited cash flow we have in hand, but not large enough to flood the whole market.

Do You feel coming interconnection between sbc designers (globally) being an useful, normative approach? (Being more practical: For example direct system bus connectors or progressive dram optimization? Ecological improvements through shared sbc fabrication or reuse/return/repair systems, means Circular Economy?)
Thx

For us it will get a decision for August. Not now, although it is an appealing device.
Reply
#9
(05-12-2018, 04:56 PM)back2future Wrote:
(05-12-2018, 03:07 PM)tllim Wrote:
(05-12-2018, 10:37 AM)Rustproof Wrote:
(05-10-2018, 03:57 PM)tllim Wrote: The first batch production ROCKPro64 board starts ship out on tomorrow. This is some people will get their board as early as late next week.

The second batch of production will starts on Monday after collecting all production data from first batch. The most time consuming is the ROCKPro64 8 layer PCB fabrication and we will negotiate with PCB factory for fasttrak. We will  try our best to release the second batch on early June, however realistic schedule is mid June.

Thanks for the detailed update.

Are you able to reveal how many RockPro64's will be produced in the mid-June batch?

Sorry that in general we don't reveal production quantity.

PINE64 operates in organic growth path and don't accept investment, this allows us to participate with PINE64 community and not need to get influence by investor decision. Since not need to chase on money trace for investor and low operating cost, this allows PINE64 operate in slim profit margin and pass this benefit to community.

BY saying so, this means that we produces enough quantity base on limited cash flow we have in hand, but not large enough to flood the whole market.

Do You feel coming interconnection between sbc designers (globally) being an useful, normative approach? (Being more practical: For example direct system bus connectors or progressive dram optimization? Ecological improvements through shared sbc fabrication or reuse/return/repair systems, means Circular Economy?)
Thx

For us it will get a decision for August. Not now, although it is an appealing device.
Reserved my opinion to comment. I always prefer simple, effective, and direct approach.
Reply
#10
(05-12-2018, 05:47 PM)tllim Wrote:
(05-12-2018, 04:56 PM)back2future Wrote:
(05-12-2018, 03:07 PM)tllim Wrote:
(05-12-2018, 10:37 AM)Rustproof Wrote:
(05-10-2018, 03:57 PM)tllim Wrote: The first batch production ROCKPro64 board starts ship out on tomorrow. This is some people will get their board as early as late next week.

The second batch of production will starts on Monday after collecting all production data from first batch. The most time consuming is the ROCKPro64 8 layer PCB fabrication and we will negotiate with PCB factory for fasttrak. We will  try our best to release the second batch on early June, however realistic schedule is mid June.

Thanks for the detailed update.

Are you able to reveal how many RockPro64's will be produced in the mid-June batch?

Sorry that in general we don't reveal production quantity.

PINE64 operates in organic growth path and don't accept investment, this allows us to participate with PINE64 community and not need to get influence by investor decision. Since not need to chase on money trace for investor and low operating cost, this allows PINE64 operate in slim profit margin and pass this benefit to community.

BY saying so, this means that we produces enough quantity base on limited cash flow we have in hand, but not large enough to flood the whole market.

Do You feel coming interconnection between sbc designers (globally) being an useful, normative approach? (Being more practical: For example direct system bus connectors or progressive dram optimization? Ecological improvements through shared sbc fabrication or reuse/return/repair systems, means Circular Economy?)
Thx

For us it will get a decision for August. Not now, although it is an appealing device.
Reserved my opinion to comment. I always prefer simple, effective, and direct approach.
Not sure if we understood the full meaning, but surely this kind of developing work is going to be a philosophy for more than one generation. Like "Three Lanes and Seven Alleys" still is known. Thx
Reply


Possibly Related Threads...
Thread Author Replies Views Last Post
  RockPro64 not booting jekohk 5 94 29 minutes ago
Last Post: Bullet64
  RockPro64 - no WiFi/BT at this time? donblanco 1 20 7 hours ago
Last Post: evilbunny
Sad RockPro64 with OpenMediaVault - Ethernet card is not recognized eduapof 8 244 04-18-2019, 08:28 AM
Last Post: g_t_j
  Building a clustered NAS with RockPro64 jl_678 1 72 04-16-2019, 12:43 PM
Last Post: jl_678
  Anybody built a RockPro64 Cluster ? axelf 9 1,155 04-10-2019, 02:04 PM
Last Post: axelf
  the 24/48 rockpro64 cluster LMM 2 171 04-05-2019, 07:35 AM
Last Post: LMM
  RockPro64 power consumption seiji 11 2,726 03-30-2019, 11:15 PM
Last Post: pfeerick
  Rockpro64 CPU fan mikeD 28 5,014 03-28-2019, 04:18 AM
Last Post: hunderteins
  ROCKPro64 2GB availability smp 1 170 03-25-2019, 10:50 PM
Last Post: tllim
  Rockpro64 boot issues larsgn 5 239 03-22-2019, 08:42 PM
Last Post: usauwf

Forum Jump:


Users browsing this thread: 1 Guest(s)