03-09-2016, 06:57 AM
ouch...
it's not the same mail box.. normally no problem.
it's not the same mail box.. normally no problem.
Shipping Progress
|
03-09-2016, 06:57 AM
ouch...
it's not the same mail box.. normally no problem.
03-09-2016, 07:33 AM
I also hope that it was just a hardware test. With new parts you have to test the yes.
(03-09-2016, 02:11 AM)tllim Wrote:Including clear case and air mouse? Still in "production"?(03-09-2016, 01:12 AM)hazerty Wrote: there are add-ons module in the mail box? (03-09-2016, 03:22 AM)tllim Wrote:(03-09-2016, 02:59 AM)SkairkrohBule Wrote:(03-09-2016, 12:26 AM)alid Wrote: -anybody- and I mean -any- -body- has got their tracking number yet?? So my board won't be shipped till 3-4th week of March... Splendid guys.
03-09-2016, 09:58 AM
Dear Tllim:
You guys are cool and do respond quickly but I am planning a project for early April and thought I could get it March and test it for early April, here is the problem. Okay when is mine "truly" coming because yesterday it say April 16th, even though I am a March backer which disappoints me that if it gets send at that time, than today it changed to nothing and its still not being shipped? Please clear this up and I feel sorry about the Feb backers gets it now finally, also its just the board and nothing else . At least please be here at April 1st. Thanks and Please understand. -GoZone TechieManny (03-09-2016, 09:58 AM)GoZone Wrote: Dear Tllim: The March 2GB board already build and ready on March 15. We plan to start ship out on third week of March, due to large quantity to dispatch, I think your pledge may deliver in end of March but I cannot guarantee. Even ship out on end of March, I don't think you will get the board on April 1. If you don't feel comfortable, please proceed with your plan B first. ... TL Lim (03-09-2016, 04:07 AM)hazerty Wrote: what about PINE64 ABS Enclosure and sd card pre loaded? microSD card already available, pre-load OS for Android will be ready on next week, Remox OS will be end of March. The ABS enclosure, designed by Johnson team, currently in plastic molding phase process, and this process takes 4 - 5 weeks.
03-09-2016, 12:40 PM
I'm March backer and this evening I see status has changed (Rewards and Add-ons are Locked).
PLEDGE STATUS
03-09-2016, 12:46 PM
Same for me
My forum topics:
• Create a WiFi hotspot on Debian 8 • Turn your Pine64 into a music server with mpd • Adjust brightness of LCD on Armbian Desktop with 1 click • My cases for Pine64 (acryl, lego & wood) • Pine 64 - DACH - Facebook page for german-speaking Pine64-fans.
03-09-2016, 01:32 PM
(03-09-2016, 05:49 AM)norm24 Wrote: http://forum.armbian.com/index.php/topic...er/?p=4467 This is not normal due to package box not ready for developer shipping but we earn a lesson from that shipment. We have make the package box stronger (K3K, triple fold type, refer to the above thread photo).
03-09-2016, 01:47 PM
That's great to hear!
Thanks for the update to this.
My forum topics:
• Create a WiFi hotspot on Debian 8 • Turn your Pine64 into a music server with mpd • Adjust brightness of LCD on Armbian Desktop with 1 click • My cases for Pine64 (acryl, lego & wood) • Pine 64 - DACH - Facebook page for german-speaking Pine64-fans.
03-09-2016, 01:58 PM
I will not have my board before 5 weeks
|