10-25-2019, 02:37 PM
For anyone that didn't see Luke's update
from https://forum.pine64.org/showthread.php?tid=8085
"
The second and third batch Pinebook Pro PCBs have already arrived at the factory and will be assembled this week. The entire laptops will be assembled and quality control checked right after; if all goes well, we'll have them shipped by the end of October or sometime in the first week of November. I'll keep you posted. [edit 24/10/19] It appears that everything is on-track regarding assembly, and the batch will indeed go out on the 29/10.
"
Most excellent!
(there's more but this is my section being a second batcher)
Looking forward to getting the email...then I'll be biting my nails!
Guessing a week or two in shipping to the U.S. (TX)
from https://forum.pine64.org/showthread.php?tid=8085
"
The second and third batch Pinebook Pro PCBs have already arrived at the factory and will be assembled this week. The entire laptops will be assembled and quality control checked right after; if all goes well, we'll have them shipped by the end of October or sometime in the first week of November. I'll keep you posted. [edit 24/10/19] It appears that everything is on-track regarding assembly, and the batch will indeed go out on the 29/10.
"
Most excellent!
(there's more but this is my section being a second batcher)
Looking forward to getting the email...then I'll be biting my nails!
Guessing a week or two in shipping to the U.S. (TX)